Please enable JavaScript in your browser to complete this form.Clients Surname *Project Reference *1. ALL - Is more than half the area of land around the "original house"* covered by extensions or other buildings? *Yes - PLANNING PERMISSION IS REQUIREDNoNot applicableFor all extensions2. ALL - Is the extension higher than the highest part of the existing roof or higher at the eaves than the existing eaves? *Yes - PLANNING PERMISSION IS REQUIREDNoNot applicableFor all extensions3. ALL - Where the extension comes within two metres of the boundary does the height at the eaves exceed three metres? *Yes - PLANNING PERMISSION IS REQUIREDNoNot applicableFor all extensionsDistance from the boundary *Put not applicable in the box if the extension is more than 2m from the boundaryEaves Height *Put not applicable in the box if the extension is more than 2m from the boundary4. ALL - Is the extension built forward of the ‘principal elevation’ or, where it fronts a highway, the ‘side elevation’? *Yes - PLANNING PERMISSION IS REQUIREDNoNot applicableFor all extensions5. ALL - Does the work include: verandas, balconies, raised platforms AND/OR a microwave antenna (e.g. TV aerial or satellite dish). a chimney, flue or soil and vent pipe AND/OR any alteration to the roof of the existing house? *Yes - PLANNING PERMISSION IS REQUIREDNoNot applicableFor all extensions6. ALL - On Article 2(3) designated land...does the work include cladding of the exterior? *Yes - PLANNING PERMISSION IS REQUIREDNoNot applicableFor all extensions7. ALL - Are the materials used in any exterior work similar appearance to those on the exterior of the existing house? *YesNo - PLANNING PERMISSION IS REQUIREDNot applicableFor all extensions8. SIDE - Does the extension exceed four metres in height? *Yes - PLANNING PERMISSION IS REQUIREDNoNot applicableFor side extensions, where it would extend beyond the ‘side elevation’ of the original house*.Height of the extension *9. SIDE - Is the extension more than half the width of the original house? *Yes - PLANNING PERMISSION IS REQUIREDNoNot applicableFor side extensions, where it would extend beyond the ‘side elevation’ of the original house*.10. SIDE - On Article 2(3) designated land* all side extensions will require householder planning permission. *This site is on Article 2(3) land - PLANNING PERMISSION IS REQUIREDNot applicableFor side extensions, where it would extend beyond the ‘side elevation’ of the original house*.11. REAR - Does the single-storey rear extension extend beyond the rear wall of the original house by more than four metres if a detached house; or more than three metres for any other house? *Yes - PLANNING PERMISSION IS REQUIREDNoNot applicableFor single storey extensions12. REAR - Where not on Article 2(3) designated land* or a Site of Special Scientific Interest; and subject to ‘prior approval’, the limit for single-storey rear extensions is increased to eight metres if a detached house; or six metres for any other house - SUBJECT TO PRIOR APPORVAL APPLICATION *NotedNot applicableFor single storey rear extensions13. SIDE - Is the extension single storey? *YesNo - PLANNING PERMISSION IS REQUIREDNot applicableFor side extensions, where it would extend beyond the ‘side elevation’ of the original house*.14. REAR - Does the single-storey rear extensions exceed four metres in height? *Yes - PLANNING PERMISSION IS REQUIREDNoNot applicableFor single storey rear extensionsHeight of the extension *15. TWO-STOREY - Does the extension (of more than one storey) extend beyond the rear wall of the original house by more than three metres or be within seven metres of any boundary opposite the rear wall of the house? *Yes - PLANNING PERMISSION IS REQUIREDNoNot applicableFor extensions of more than one storey16. TWO-STOREY - Does the roof pitch match existing house as far as practicable (note that this also applies to any upper storey built on an existing extension)? *YesNo - PLANNING PERMISSION IS REQUIREDNot applicableFor extensions of more than one storey17. TWO-STOREY - Any upper-floor window located in a ‘side elevation’ must be obscure-glazed; and non-opening (unless the openable part is more than 1.7 metres above the floor). *NotedNot applicableFor extensions of more than one storey18. TWO-STOREY - All side extensions of more than one storey will require householder planning permission. *NotedNot applicableFor extensions of more than one storey19. TWO-STOREY - On Article 2(3) designated land* all rear extensions of more than one storey will require householder planning permission. *NotedNot applicableFor extensions of more than one storeySubmit